Production Report for the 3 months ended 31 March 2025
Eduardo Landin, Chief Executive Officer commented:
"Traditionally, the first quarter represents our lowest production period and 2025 has been in line with this. Pleasingly, Inmaculada has delivered a solid performance and we are seeing encouraging developments in
However, at the Mara Rosa operation in
Operational highlights
§ Q1 2025 attributable production[1]
o 58,021 ounces of gold
o 1.8 million ounces of silver
o 79,941 gold equivalent ounces
o 6.6 million silver equivalent ounces
§ 2025 guidance maintained:
o Production of 350,000-378,000 gold equivalent ounces
o All-in sustaining costs of
Project & Exploration highlights
§ Work at Monte Do Carmo project commenced
o Installation license granted
o 19% of detailed engineering complete
§ Sale of Arcata and Azuca projects completed, streamlining the portfolio to focus on core assets
§ 2025 brownfield drilling campaign commenced at all sites - results due from Q2 2025
ESG highlights
§ Lost Time Injury Frequency Rate of 0.82 (FY 2024: 1.25)[2]
§ Accident Severity Index of 27 (FY 2024: 365)[3]
§ Water Consumption of 132lt/person/day (FY 2024: 138lt/person/day)
§ Domestic waste generation of 0.87kg/person/day (FY 2024: 0.93kg/person/day)
§ ECO score of 5.60 out of 6 (FY 2024: 5.58)[4]
Financial position
§ Total cash of approximately
§ Net debt of approximately
§ Current Net Debt/LTM EBITDA of approximately 0.6x as at 31 March 2025
_______________________________________________________________________________________
A conference call will be held at 2.30pm (
Dial in details as follows:
International Dial in: +44 330 551 0200;
US Local: +1 786 697 3501
Canada Toll Free: +1 866 378 3566
Password: Hochschild Q1
Please dial into the call approximately ten minutes before the 2.30pm start time.
A recording of the conference call will be available on demand on the Company's website: www.hochschildmining.com
________________________________________________________________________________________
Overview
In Q1 2025, Hochschild delivered attributable production of 79,941 gold equivalent ounces with an in-line performance from Inmaculada offset by a lower-than-expected contribution from the Mara Rosa mine in
The Company reiterates its overall attributable production and all-in sustaining cost guidance for 2025 of 350,000-378,000 gold equivalent ounces and
TOTAL GROUP PRODUCTION
|
Q1 2025 |
Q4 2024 |
Q1 2024 |
12 mths |
Silver production (koz) |
2,177 |
2,855 |
2,427 |
10,530 |
Gold production (koz) |
64.96 |
82.83 |
53.79 |
281.14 |
Total silver equivalent (koz) |
7,568 |
9,730 |
6,892 |
33,864 |
Total gold equivalent (koz) |
91.18 |
117.23 |
83.03 |
408.00 |
Silver sold (koz) |
2,177 |
2,842 |
2,445 |
10,643 |
Gold sold (koz) |
60.95 |
82.94 |
52.18 |
281.46 |
Total production includes 100% of all production, including production attributable to Hochschild's joint venture partner at
ATTRIBUTABLE GROUP PRODUCTION
|
Q1 2025 |
Q4 2024 |
Q1 2024 |
12 mths |
Silver production (koz) |
1,819 |
2,240 |
1,977 |
8,496 |
Gold production (koz) |
58.02 |
71.27 |
45.94 |
245.01 |
Silver equivalent (koz) |
6,635 |
8,155 |
5,790 |
28,832 |
Gold equivalent (koz) |
79.94 |
98.25 |
69.76 |
347.37 |
Attributable production includes 100% of all production from Inmaculada, Pallancata, Mara Rosa and 51% from
Production
Inmaculada
Product |
Q1 2025 |
Q4 2024 |
Q1 2024 |
12 mths |
Ore production (tonnes treated) |
333,613 |
342,014 |
263,024 |
1,197,965 |
Average grade silver (g/t) |
152 |
160 |
181 |
179 |
Average grade gold (g/t) |
3.46 |
3.29 |
4.21 |
3.90 |
Silver produced (koz) |
1,444 |
1,589 |
1,509 |
6,368 |
Gold produced (koz) |
34.78 |
33.70 |
36.70 |
143.78 |
Silver equivalent (koz) |
4,331 |
4,385 |
4,555 |
18,302 |
Gold equivalent (koz) |
52.18 |
52.84 |
54.88 |
220.50 |
Silver sold (koz) |
1,440 |
1,583 |
1,387 |
6,342 |
Gold sold (koz) |
35.12 |
33.71 |
34.01 |
143.64 |
Inmaculada's first quarter production was 34,780 ounces of gold and 1.4 million ounces of silver which amounts to gold equivalent output of 52,180 ounces (Q1 2024: 57,877 ounces). Slightly higher than expected tonnage in the quarter was offset by lower gold grades although the overall result for the period was in line with the 2025 plan and puts the mine on track to achieve its annual target.
Product |
Q1 2025 |
Q4 2024 |
Q1 2024 |
12 mths |
Ore production (tonnes treated) |
152,950 |
160,097 |
125,520 |
581,303 |
Average grade silver (g/t) |
181 |
275 |
258 |
253 |
Average grade gold (g/t) |
3.53 |
5.26 |
4.58 |
4.55 |
Silver produced (koz) |
729 |
1,256 |
919 |
4,150 |
Gold produced (koz) |
14.16 |
23.61 |
16.03 |
73.73 |
Silver equivalent (koz) |
1,904 |
3,215 |
2,249 |
10,270 |
Gold equivalent (koz) |
22.95 |
38.73 |
27.09 |
123.73 |
Silver sold (koz) |
734 |
1,254 |
1,057 |
4,290 |
Gold sold (koz) |
13.71 |
23.27 |
18.25 |
74.37 |
The first quarter at
Mara Rosa
Product |
Q1 2025 |
Q4 2024 |
Q1 2024 |
12 mths |
Ore production (tonnes treated) |
584,421 |
615,759 |
86,192 |
1,757,955 |
Average grade silver (g/t) |
- |
- |
- |
- |
Average grade gold (g/t) |
0.89 |
1.42 |
1.03 |
1.35 |
Silver produced (koz) |
3 |
11 |
- |
11 |
Gold produced (koz) |
16.02 |
25.53 |
1.06 |
63.64 |
Silver equivalent (koz) |
1,333 |
2,130 |
88 |
5,293 |
Gold equivalent (koz) |
16.06 |
25.66 |
1.06 |
63.77 |
Silver sold (koz) |
3 |
4.19 |
- |
11 |
Gold sold (koz) |
12.12 |
25.97 |
- |
63.54 |
In
Management has initiated a programme to increase throughput, including expanding the scale of mining operations and strengthening the drilling and blasting processes. This also includes the expansion of our waste removal fleet, at no additional cost, doubling capacity from 1.5 million tonnes to 3.0 million tonnes per month, supported by the addition of six CAT 777 trucks and a Hitachi 2600 excavator to recover from the accumulated delays from the last two quarters. Production is expected to improve in the second half of the year after a similar level of production in the second quarter which will be a period of stabilisation.
Average realisable prices and sales
Average realisable precious metal prices in Q1 2025 (which are reported before the deduction of commercial discounts) were
Advanced Project: Monte Do Carmo
Work has continued on the Monte Do Carmo project in the first quarter and included:
§ Completion of metallurgical testwork
§ Progress on detailed engineering reaching 19% completion
§ Meetings with the Governor of the
§ Meeting with
§ Award of the installation licence
§ Signing of contract for transmission line as well a power distribution network to support water intake and construction infrastructure
Brownfield exploration
The 2025 brownfield exploration programme has begun at all sites during the period with early result pending. The first drill results will be reported in the Q2 production statement in July.
Financial position
Total cash was approximately
____________________________________________________________________________________
Enquiries:
Hochschild Mining PLC
Charles Gordon +44 (0)20 3709 3264
Head of Investor Relations
Hudson Sandler
Charlie Jack +44 (0)207 796 4133
Public Relations
_____________________________________________________________________________________
About Hochschild Mining PLC
Hochschild Mining PLC is a leading precious metals company listed on the London Stock Exchange (HOCM.L / HOC LN) and crosstrades on the OTCQX Best Market in the U.S. (HCHDF), with a primary focus on the exploration, mining, processing and sale of silver and gold. Hochschild has over fifty years' experience in the mining of precious metal epithermal vein deposits and operates two underground epithermal vein mines: Inmaculada, located in southern Peru; and San Jose in southern Argentina, and an open pit gold mine, Mara Rosa, located in the state of Goiás, Brazil. Hochschild also has numerous long-term projects throughout the Americas.
_____________________________________________________________________________________
Forward looking statements
This announcement may contain forward looking statements. By their nature, forward looking statements involve risks and uncertainties because they relate to events and depend on circumstances that will or may occur in the future. Actual results, performance or achievements of Hochschild Mining PLC may, for various reasons, be materially different from any future results, performance or achievements expressed or implied by such forward looking statements.
The forward looking statements reflect knowledge and information available at the date of preparation of this announcement. Except as required by the Listing Rules and applicable law, the Board of Hochschild Mining PLC does not undertake any obligation to update or change any forward looking statements to reflect events occurring after the date of this announcement. Nothing in this announcement should be construed as a profit forecast.
Note
The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (Regulation (EU) No.596/2014). Upon the publication of this announcement via a Regulatory Information Service, this inside information is now considered to be in the public domain.
LEI: 549300JK10TVQ3CCJQ89
- ends -
[1]All equivalent figures assume the average gold/silver ratio of 83x.
[2]Calculated as total number of accidents per million labour hours
[3]Calculated as total number of days lost per million labour hours.
[4]The ECO Score is an internally designed Key Performance Indicator measuring environmental performance in one number and encompassing numerous fronts including management of waste water, outcome of regulatory inspections and sound environmental practices relating to water consumption and the recycling of materials.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.